Hiring of a Vessel for a period of twelve (12) months for Maintenance and Emergency Response Work connected with the Single Point Buoy Mooring (SPBM), installed off-shore Colombo harbour
10 Nos Each of 30A/60A/100A Three Phase Energy Meter Direct Reading Type, 03 Nos. of Motor Driven Bilges Pumps for Pilot and Mooring Launches, Shirts Shorts Long Sleeves 2400 Nos.