Climatic Chamber (Qty:02), Atomic Absorption Spectrometer, Temperature Humidity Climatic Unit And Fume Hood for Chemical Digestion with Scrubber System
Constructing a semi-aerobic Landfill facility,Supply, Installation, Commissioning and Maintenance of Street LED Solar Lights And Unused Stainless Steel Water Bowser
Supply and Installation of Cool Room Facility for Storing Garbage at the Roof Terrace of Floor 4 of the Bank of Ceylon Headquarters Building, Colombo 01 (Engineers Estimate: Rs. 8.0 Million plus VAT).
Installation of protective iron mesh and air conditioning systems for the Eye Unit (Ward No. 06) and the Outpatient Department (OPD) building at Kahawatta Base Hospital
Passenger Facility Improvement at Wellawaya Central Bus 1. Stand,Provisioning of Public Storage Locker, Electrical Restoration work of Fire Affected 3 Area
Supply and Installation of Cool Room Facility for Storing Garbage at the Roof Terrace of Floor 4 of the Bank of Ceylon Headquarters Building, Colombo 01 (Engineers Estimate: Rs. 8.0 Million plus VAT)