Supply, Installation, Testing, Commissioning and Maintenance of 800kg (01 No.) & 630kg (01 No.) Passenger Elevators for Construction of Courts Complex Pugoda.
Supply, Flushing and Refilling of Compressor Oil of Dunham-Bush Chiller for Central Air Conditioning System at Regional Support Centre (Western-South) Office Contract No: W-S/P&C/OIL(01)/DGM/O&M/2024/32
Supply and Delivery of 1157 Nos, of Volumetric Displacement type 25mm (1") Water Meters, 434 Nos.of Volumetric Displacement type 32 mm (1/4") Water Meters and 1005 nos. of Volumetric Displacement type 40m (1/2") Water Meters
Water proofing toilet complex for Ward Nos: 17-22 (AC-1/80/2024), Aluminium partitioning & minor repair works in old OPD Pharmacy (AC-1/87/2024, Construction of roof for lift motor room & lobby of Ward No. 11 (AC-1/13/2024), Renovation of cool room in RIA Laboratory (AC-1/81/2024)
BALANCE PIPE INSTALLATION, INTERCONNECTING PIPING IN THE CHILLER PLANT ROOM AND THE ROOFTOP COOLING TOWER AREA, AND TESTING & COMMISSIONING OF MVAC EQUIPMENT IN BLOCK 01, 02, 08 OF DHQC PROJECT, AKUREGODA
BALANCE PIPE INSTALLATION, INTERCONNECTING PIPING IN THE CHILLER PLANT ROOM AND THE ROOFTOP COOLING TOWER AREA, AND TESTING & COMMISSIONING OF MVAC EQUIPMENT IN BLOCK 01, 02, 08 OF DHQC PROJECT, AKUREGODA