Power System Strengthening and Renewable Energy Integration Project: Package 5A Augmentation of Kolonnawa Grid Substation for the Grid-Scale Battery Energy Storage System (BESS) of 100 MW/100 MWh on a Turnkey Basis OCB No: CEB/AGM/PR/2025/OCB/PSSREIP-5A
Power System Strengthening and Renewable Energy Integration Project: Package SB Procurement of Grid-Scale Battery Energy Storage System (BESS) of 100MW/100MWh at Kolonnawa Grid Substation on a Turnkey Basis
Supply & Delivery of Fault Passage Indicator System with Remote Communication Facility for Medium Voltage Overhead Lines, Bus Bar Chamber for Multiple Service Connection
Reflective Yellow LED bulb system, Water pumps (horse power 4, 2 inch), Insect repellant nets (for covers of 14 inter circumference), Sprinkler irrigation system acre 4 (unit)
Supply & Installation of Intake Pumps, High Lift Pump and all M&E Equipments, Supply & Installation of Main Incoming Panel, Supply and Installation of Bore Hole type Submersible Water Pumping Sets and Accessories(check closing date)
CONSTRUCTION OF SALES BUILDING, CANOPY, DRIVEWAY & OTHER ALLIED ELECTRICAL WORKS AT LANKA IOC PLC "A" SITE PETROL SHED M/S A.W. DAVITH APPUHAMY & SONS, KANDY