OBTAINING TOYOTA AXIO HYBRID CAR, FULL OPTION WITH A/C, MANUFACTURED IN THE YEAR 2016 OR THEREAFTER, WITH DRIVER ON HIRE BASIS FOR A PERIOD OF ONE (01) YEAR
Carpeting of Gamakumbura Kudalunuka Yalwela Road (6+000-8+000km/9+000-9+340km)". It should be amended as "Carpeting of Gamakumbura Kudalunuke Yalwela Road (3+250-4+550km/9+000-9 +350km)
OBTAINING TOYOTA AXIO HYBRID CAR, FULL OPTION WITH A/C, MANUFACTURED IN THE YEAR 2016 OR THEREAFTER, WITH DRIVER ON HIRE BASIS FOR A PERIOD OF ONE (01) YEAR
Reconstruction of Nelum Wewa situated within Kottukachchiya Farm in Puttalam District Cutting Out 68,495 Sq. Metres of Soil from inside the Wewa, Stockpile and Transport
PROCUREMENT OF TRAINING EQUIPMENT & TOOLS FOR THE SOLAR PHOTOVOLTAIC TECHNICIAN COURSE (NVQ 4) AT COLLEGES OF TECHNOLOGY ANURADHAPURA & KURUNEGALA AND TECHNICAL COLLEGES OF ANAMADUWA, BATTICALOA, HOMAGAMA, KALUTARA, NUWARA ELIYA & WARAKAPOLA - 2025 [GIZ VTSL-II-SPVT